AECORD
1 / 4© Studio photography

Skyline Apartment Tower

Architects
Area
1,50,000 sqft
Location
Bengaluru
Photographs
Studio photography
AECORD Cost Index₹2,500/sqft · PREMIUM tier · ₹350.0 Cr total
₹350.0 Cr
Total build cost
₹2,500
Cost per sqft
1,50,000 sqft
Built-up
Completed
Phase
PREMIUM
Quality tier

This sophisticated apartment tower, designed for Skyline Builders in Calicut, is a perfect blend of elegance and functionality. Spanning 1.5 lakh sq. ft. across a 1-acre site, the project encapsulates contemporary design principles while ensuring optimal space utilization and luxury. The architecture reflects modern urban aesthetics, seamlessly integrated with timeless elements to create a landmark living experience. Our scope included comprehensive architectural design, focusing on innovative layouts that maximize natural light and ventilation, and meticulous interior design tailored to complement the refined lifestyle of its residents. The result is a harmonious balance between form and function, with every detail crafted to elevate everyday living. Positioned in the vibrant city of Calicut, this project sets a new benchmark for residential developments, embodying the trust and quality synonymous with Skyline Builders. It stands as a testament to our commitment to delivering excellence in design and execution.

Detailed cost breakdowns

Costs shown reflect a transparent BOQ snapshot the team shared with AECORD at completion. Per-sqft figures cover civil + finishes + MEP unless otherwise noted.

Actual cost
₹350.0 Cr
₹/sqft
2,500/sqft
Quality tier
PREMIUM
Built-up
1,50,000 sqft
Cost breakdown
All figures in ₹ · ₹350.0 Cr total
38%
24%
16%
10%
Structure38%
Finishes24%
Mep16%
Landscape5%
Ffe7%
Other10%

Cost drivers

What pushed the budget upward.

+₹3K
  • RCC Structure
    ₹1K
  • Premium Interior Finishes
    ₹900
  • MEP Services
    ₹600

Cost savings

Choices that kept the budget honest.

₹140
  • Efficient Floor Planning
    ₹80
  • Natural Lighting & Ventilation
    ₹60
Net pressure on the original BOQ+₹3K
BOQ summary verified by AECORD editors. Read our cost methodology →

Who built it, and how

Be the first to review this project

Reviews are moderated before publication. Share what stood out about the team, execution, budget fit, or material choices.

FAQ

No public answers yet — use Ask about this project above to ask about materials, team, budget signals, or how to build something similar.