1 / 3© Studio photography
FEATURED PROJECTbungalow

Steps Villa

A family home that expands to a luxurious living space

Architects
Area
10,000 sqft
Location
Bengaluru
Photographs
Studio photography
Lead Architect
Meghna Sri
Typology
5BHK
AECORD Cost Index₹3,250/sqft · ₹3.0 Cr total
₹3.0 Cr
Total build cost
₹3,250
Cost per sqft
10,000 sqft
Built-up
Completed
Phase

Royal Oak Villas is a premier residential project in Bengaluru that redefines luxury living through exceptional architectural design. Each villa, with a sprawling built-up area of 6,000 sq. ft. or more, is crafted to deliver unparalleled sophistication and functionality. The design seamlessly integrates contemporary aesthetics with timeless elegance, catering to the refined tastes of modern homeowners. The architecture emphasises open spaces, natural light, and fluidity in design, creating a harmonious connection between indoor and outdoor living. Each villa is a masterpiece, tailored to provide a unique living experience that reflects the individual personality of its residents. Nestled in the vibrant city of Bengaluru, Royal Oak Villas embodies exclusivity and grandeur, offering an oasis of tranquillity amidst urban conveniences. This project is a testament to our commitment to delivering meticulously designed spaces that elevate the standards of luxury living

Detailed cost breakdowns

Costs shown reflect a transparent BOQ snapshot the team shared with AECORD at completion. Per-sqft figures cover civil + finishes + MEP unless otherwise noted.

Actual cost
₹3.0 Cr
₹/sqft
3,250/sqft
Built-up
10,000 sqft
Cost breakdown
All figures in ₹ · ₹3.0 Cr total
40%
25%
15%
10%
Structure40%₹1.3 Cr
Finishes25%₹81.3 L
Mep15%₹48.8 L
Landscape5%₹16.3 L
Ffe10%₹32.5 L
Other5%₹16.3 L

Cost drivers

What pushed the budget upward.

+₹40.0 L
  • Marbles & plush cladding
    ₹25.0 L
  • Chandeliers
    ₹15.0 L

Cost savings

Choices that kept the budget honest.

  • Solar Panels on roof
    Qualitative
  • Wall minimised
    Qualitative
Net pressure on the original BOQ+₹40.0 L
BOQ summary verified by AECORD editors. Read our cost methodology →

Who built it, and how

Be the first to review this project

Reviews are moderated before publication. Share what stood out about the team, execution, budget fit, or material choices.

FAQ

No public answers yet — use Ask about this project above to ask about materials, team, budget signals, or how to build something similar.