Construction 101Free course

Learn how building actually works

A guided, plain-English path through the construction industry — from who does what, to contracts, money, approvals and materials. Follow it level by level, or jump to whatever you need. We’ll track how far you’ve come.

10 levels33 lessonsFree · learn at your pace
Begin the pathHow a Construction Project Actually WorksStart Here · 3 min read
Start learning
1
Level 1

Start Here

Get the lay of the land — how a build flows from idea to keys, and who does what.

1
  1. 1.1How a Construction Project Actually WorksIf the construction world feels chaotic — a blur of architects, contractors, dealers, approvals and payments — this is y…Everyone3 min
2
Level 2

Who's Who

Meet every role on a project so you always know who to call and what they own.

3
  1. 2.1Who's Who on a Construction ProjectA construction project can involve a dozen different roles, and the job titles overlap confusingly. Here is the full cas…Everyone3 min
  2. 2.2Contractor vs Subcontractor vs Labour ContractorThree roles, one confusing word. Getting the difference right tells you exactly who is accountable when something goes w…Everyone3 min
  3. 2.3Sellers, Distributors, Dealers & "Seller-Contractors", DecodedThis is the part of construction that confuses almost everyone: the tangle of manufacturers, distributors, dealers, stoc…Everyone3 min
3
Level 3

Contracts

Understand the agreement that protects you — the types, the clauses, the red flags.

2
  1. 3.1Construction Contract Types ExplainedThe contract you choose decides who carries the risk of cost overruns, how you pay, and how much control you keep. Here…Everyone3 min
  2. 3.2Contract Red Flags to Walk Away FromMost construction disputes are baked in at signing. These are the red flags that separate a fair agreement from one desi…For homeowners3 min
4
Level 4

Money & Payments

Follow the money: milestone stages, retention, GST and how not to overpay.

2
  1. 4.1How Construction Payments WorkMoney in construction moves in stages, not one lump. Understanding the milestone model — advance, progress payments, ret…Everyone3 min
  2. 4.2GST on Construction, in Plain EnglishGST on construction confuses almost everyone because it is different depending on what you are actually buying — a contr…Everyone3 min
5
Level 5

The Build

What actually happens on site, phase by phase, from foundation to finishing.

3
  1. 5.1From Empty Plot to Handover: The Build Stage by StageEvery building follows the same broad sequence, whether it is a single home in Bengaluru or a small apartment block. Her…Everyone3 min
  2. 5.2Foundation Types, in Plain EnglishThe foundation is the part of your building you never see and can never easily fix. Here is a simple guide to the main t…For homeowners3 min
  3. 5.3Construction Timelines (and Why They Slip)Almost every project takes longer than the first estimate. Understanding where time actually goes helps you plan realist…Everyone3 min
7
Level 7

Materials & Procurement

Buy smart — the supply chain, brands, quantities and getting the right bill.

3
  1. 7.1Cement Grades: OPC vs PPC, 43 vs 53The bag says OPC 53 or PPC — but what does that actually mean for your slab, plaster or brickwork? Here is how cement gr…Everyone3 min
  2. 7.2TMT Steel Bars: Grades & What to CheckTMT bars are the skeleton inside your concrete. Here is what Fe 500, 500D and 550 mean, how steel is priced and sold, an…Everyone3 min
  3. 7.3Bricks vs Blocks: Red, Concrete & AACRed brick, concrete block or AAC? The walling material you choose changes cost, build speed, weight on your structure an…For homeowners3 min
8
Level 8

Quality & Measurement

Check the work: how quantities are measured and quality is verified.

3
  1. 8.1BOQ (Bill of Quantities), ExplainedA BOQ is the single most useful document in a construction project — it turns a vague "build my house" into a priced, it…Everyone3 min
  2. 8.2Rate Analysis & Schedule of Rates (SOR)Every number in a BOQ hides a small calculation called rate analysis. Learn how professionals build a unit rate from the…For professionals3 min
  3. 8.3Quality Checks Every Site Should DoGood buildings are not an accident — they come from a handful of checks repeated every single day. Here are the quality…Everyone3 min
9
Level 9

Risk & Protection

Spot trouble early and protect yourself when things go wrong.

3
  1. 9.1Defect Liability Period (DLP), ExplainedThe Defect Liability Period is your safety net after handover — the window in which your contractor is contractually bou…Everyone3 min
  2. 9.2Delays, Penalties & Liquidated DamagesAlmost every project runs late for some reason — the question is who carries the cost when it does. A well-written delay…Everyone3 min
  3. 9.3How Homeowners Get Cheated (and How to Avoid It)Most people build once or twice in a lifetime, against contractors who do it every day. That knowledge gap is where mone…For homeowners4 min
10
Level 10

In-Depth Guides

Longer deep-dives for when you want the complete picture on a topic.

10
  1. 10.1Complete Guide to Hiring an Architect in IndiaHiring the right architect can make or break your building project. This guide covers everything from understanding arch…For homeowners4 min
  2. 10.2Interior Design Guide for Indian HomesInterior design in India has evolved dramatically — from basic furnishing to curated, functional spaces that reflect you…For homeowners4 min
  3. 10.3Structural Engineering Essentials for Building ProjectsStructural engineering is the backbone of every safe building. This guide explains the fundamentals of structural design…For homeowners5 min
  4. 10.4MEP Engineering Guide for Modern BuildingsMEP (Mechanical, Electrical, and Plumbing) engineering accounts for 30-40% of a building's construction cost yet is ofte…For homeowners5 min
  5. 10.5Construction Management Guide for Indian ProjectsConstruction management in India is uniquely challenging — managing labor, materials, monsoon schedules, regulatory comp…For homeowners5 min
  6. 10.6Green Building & Sustainability Guide for IndiaGreen building in India is transitioning from a niche concept to mainstream necessity. With ECBC mandates, rising energy…For homeowners5 min
  7. 10.7RERA Compliance Guide: Everything You Need to KnowThe Real Estate (Regulation and Development) Act, 2016 (RERA) transformed India's real estate sector by mandating transp…For homeowners5 min
  8. 10.8Complete Home Renovation Guide for IndiaWhether you are renovating a 20-year-old flat or updating your parents' house, home renovation in India comes with uniqu…For homeowners4 min
  9. 10.9Building Materials & Procurement GuideMaterials account for 55-65% of total construction cost in India. Choosing the right materials at the right price, while…For homeowners5 min
  10. 10.10Guide to Working with AECO Professionals in IndiaA successful building project requires coordinating multiple professionals — architects, structural engineers, MEP engin…For homeowners6 min
Tools & calculators

Estimate before you commit

Size up a build cost in seconds — the same estimator our readers use across the magazine. No sign-in needed.

Cost estimator

Build cost · Bengaluru, May 2026

Estimated turnkey cost
₹79.67 L
₹74.09 L₹87.63 L₹4,426/sqft
Civil Services Finishes Fees Inclusions
Excludes land, GST & statutory fees. ±10% based on site conditions.Get 3 matched quotes
Compare platforms

Platform types for AECO projects

Understand different platform models — managed interiors, turnkey construction, directories, and open marketplaces.

See the full comparison
FAQ

Common construction questions

Quick answers to the questions homeowners ask most.

What is the construction cost per sq ft in India in 2026?
Construction costs in India in 2026 range from Rs 1,400 to Rs 4,500+ per sq ft depending on city, quality, and specifications. Basic construction (standard finishes, local materials) costs Rs 1,400-1,800 per sq ft in Tier-2/3 cities and Rs 1,800-2,200 in Tier-1 cities. Mid-range construction (vitrified tile flooring, branded fittings, modular kitchen, good-quality doors and windows) runs Rs 2,200-3,000 per sq ft. Premium construction (Italian marble, imported fittings, central AC, home automation, designer lighting) costs Rs 3,000-4,500+ per sq ft. These rates include structure, finishing, electrical, plumbing, and basic fixtures but exclude interior furniture, landscaping, and architect fees. Bengaluru and Hyderabad tend to be 10-15% cheaper than Mumbai and Delhi NCR for equivalent quality. Always get detailed BOQ-based quotations rather than per-sq-ft rates to avoid hidden extras.
How long does it take to build a house in India?
A typical G+2 residential building (3,000-4,000 sq ft) in India takes 10-14 months from foundation to handover. The breakdown is: building-plan approval (1-3 months), excavation and foundation (3-4 weeks), ground-floor structure (6-8 weeks), first and second floor structure (4-6 weeks each), brick work and plastering (6-8 weeks), electrical and plumbing rough-in (concurrent with masonry, 4-6 weeks), flooring and tiling (3-4 weeks), painting and finishing (3-4 weeks), and final fixtures and cleanup (2-3 weeks). Major factors causing delays in India include monsoon season (June-September slows work significantly), material shortages (especially during sand mining bans), festival periods, labour availability, and client-initiated design changes. Building during October to May is optimal in most Indian cities.
How do I choose a good contractor in India?
Selecting the right contractor is critical for Indian construction projects. Key criteria include: verified track record with at least 5 completed residential projects you can physically visit, proper GST registration and labour licence, willingness to sign a detailed contract with penalty clauses for delays, transparent BOQ (Bill of Quantities) with brand specifications for every material, references from recent clients (visit their completed sites), financial stability (a contractor who takes too many projects simultaneously may face cash-flow issues affecting your project), and a dedicated site supervisor. Red flags include: demand for large advance payments (standard is 10-15% mobilisation advance), reluctance to provide detailed written quotations, no GST billing, and verbal promises without documentation. AECORD-verified contractors undergo background checks and have rated portfolios from past clients.
What is a BOQ and why is it important?
A BOQ (Bill of Quantities) is an itemised list of every material, labour task, and specification required for your construction project. In India, a detailed BOQ is the single most important document for cost control and dispute prevention. It should list: quantities (e.g., 150 bags of OPC 53 grade UltraTech cement), unit rates (e.g., Rs 380 per bag), specifications (e.g., Kajaria 800x800mm glazed vitrified tiles, Stardust series), and total amounts for each item. A proper BOQ for a 2,000 sq ft house typically runs 150-200 line items across categories: earthwork, RCC, masonry, plastering, flooring, electrical, plumbing, painting, doors and windows, external development, and miscellaneous. Without a BOQ, contractors give vague per-sq-ft rates and charge extras for items the client assumed were included — the most common dispute in Indian construction.
What approvals are needed before starting construction in India?
Before starting construction in India, you need: Building plan approval from the local municipal authority (corporation, municipality, or panchayat) — submitted through online portals like BPAS (Karnataka), DPMS (Telangana), or EDCR (common in many states). Additional NOCs may include: airport authority clearance if within flight-path zones, environmental clearance for plots near water bodies or in eco-sensitive zones, NOC from fire department for buildings above 15m, tree-cutting permission if applicable, and water and sewage connection approval. For plots in layouts approved by development authorities (BDA, HMDA, DTCP), verify the layout approval is current. For agricultural land conversion, obtain NA (Non-Agricultural) order from the revenue department before applying for building permission. RERA registration is required if you are a builder developing a project above 500 sq m or 8 apartments.
Should I use RMC or site-mixed concrete?
Ready-Mix Concrete (RMC) is strongly recommended over site-mixed concrete for all structural work in India. RMC from certified plants (UltraTech, ACC, Lafarge, Nuvoco) uses computerised batching for precise water-cement ratio and mix design, resulting in consistent strength. Site-mixed concrete is prone to human error in proportioning, water addition, and mixing time. Cost-wise, RMC is Rs 4,500-7,500 per cubic metre (depending on grade and city), while site mixing appears cheaper at Rs 3,500-5,500 per cu m but wastes 15-20% more material. RMC advantages include: tested quality with cube test reports for every batch, faster pouring (a slab that takes 2 days with site mixing takes 4-6 hours with RMC), and less site storage. For small quantities under 2 cu m (minor repairs, compound walls), site mixing is acceptable. For all structural pours — foundation, columns, beams, and slabs — always use RMC.
What is the role of a site supervisor in Indian construction?
A site supervisor (or site engineer) is essential for quality construction in India, where most labour is semi-skilled. Their responsibilities include: daily monitoring of work quality and progress, verifying material deliveries against BOQ specifications (checking cement brand, steel grade, aggregate quality), ensuring structural drawings are followed correctly (rebar placement per bar bending schedule, column dimensions, beam depth), managing 15-30 labourers and subcontractors, maintaining the site diary (daily work record, material usage, labour count), coordinating concrete pours with RMC plant, and reporting progress to the architect and owner. A full-time site supervisor costs Rs 25,000-50,000 per month. Without one, common issues include: incorrect steel placement, excess water in concrete, wrong brick bond, and material pilferage. For owner-built homes where the architect visits only weekly, a competent site supervisor is the critical quality link.
How much cement, steel, and sand is needed for 1,000 sq ft construction?
For a standard G+1 residential building of 1,000 sq ft per floor (2,000 sq ft total), approximate material requirements are: Cement — 350-450 bags (50 kg each) of OPC 53 grade, costing Rs 1.3-1.8 lakh. Steel (TMT bars) — 3-4.5 tonnes of Fe500/Fe500D grade, costing Rs 1.5-2.5 lakh. River sand (or M-sand) — 40-50 cu m for masonry, plastering, and concrete, costing Rs 60,000-1.5 lakh depending on city and sand type. Coarse aggregate (20mm and 12mm) — 35-45 cu m, costing Rs 50,000-80,000. Bricks — 12,000-15,000 numbers for 230mm and 115mm walls, costing Rs 80,000-1.5 lakh. These are thumb-rule estimates — actual quantities depend on structural design, soil condition, number of floors, and specifications. A detailed BOQ from your engineer gives precise quantities. M-sand (manufactured sand) is increasingly replacing river sand in South Indian cities due to river-sand scarcity and consistent quality.
What is the payment schedule for a construction contractor in India?
A standard payment schedule for Indian residential construction is milestone-based: Mobilisation advance — 10% at contract signing (some contractors ask 15%, never pay more than 15% upfront). Foundation completion — 15% (after PCC, footings, and plinth beam). Ground floor slab — 15%. First floor slab — 15% (and similarly for additional floors). Brick work and plastering — 15%. Flooring and internal finishes — 10%. Final finishing and handover — 5% (retained for 30-60 days as defect liability period). Always tie payments to verified milestones with photo documentation. Keep 5-10% as retention money released only after a defect-free inspection. Never pay ahead of completed work — this is the most common mistake in Indian construction. Get each payment acknowledged in writing with a running account statement. For materials purchased directly by the owner, adjust the contractor's payments proportionally.
What insurance do I need during house construction?
Construction insurance in India is often overlooked but increasingly important. Key policies include: Contractor's All Risk (CAR) policy — covers damage to the structure during construction from fire, storm, flooding, theft, and third-party liability; premiums are typically 0.15-0.3% of construction cost (Rs 3,000-6,000 for a Rs 20 lakh project). Workmen's Compensation policy — legally required under the Workmen's Compensation Act, 1923, covering injury or death of construction workers; the contractor should carry this, but verify it. Builder's Risk policy — broader coverage including design errors and mechanical breakdown. For self-built homes, a CAR policy from insurers like New India Assurance, United India, or ICICI Lombard is recommended, costing Rs 5,000-15,000 for a typical residential project. After construction completion, convert to a standard home insurance policy covering the structure and contents against natural disasters, fire, and theft.
See all FAQs

Quick quizzes & mock tests

Test yourself with quick quizzes and timed mock tests across sustainability, materials, techniques and certification prep. See where you actually stand.

Browse QuizzesIndustry Surveys

AECO Pulse surveys

Follow the public industry confidence index, read published reports, and contribute to live waves as a professional to unlock segment benchmarks.

Explore SurveysPulse Index

Ready to start your project?

Connect with verified architects, engineers, contractors and material sellers on AECORD. Free for clients.

Browse ProfessionalsExplore Services